post https://api.amberflow.io/api/v1/groups//control
Create a control action for all locations in the given group.
There are four control options:
- max_grid_export: This is the maximum amount of power that can be exported, given the grid constraints.
- zero_grid_export: This will limit the power export to zero.
- max_grid_import: This is the maximum amount of power that can be imported, given the grid and operational constraints.
- power_delta: Set a power delta to the forecasted power flow. This requires the "value" field to be set.